No portion of this site may be copied, retransmitted, reposted, duplicated or otherwise used.
Industrial Equipment, Machinery & Business Supplies. Industry news and information - www.industrysearch.com.au
Provided by: IBC Solutions 8/09/2008 - As a result of a Project carried out for United Group, IBC Solutions and LMK Thermosafe have designed and delivered five IBC1 heater jackets for use at the Tamar Valley Power Station on E445 and E469 side discharge Bulkboxes. The process of delivery was a chance to show how quickly a new jacket design can be manufactured and delivered. “The United Project gave us the opportunity to show how we can develop and deliver a non-standard jacket within a four to five week period, without the LMK people actually seeing the container itself” says Nigel Smalls of IBC Solutions. “This is partly due to our expertise in Australia in knowing what to look for, in this case how to make the side discharge flap / cover work effectively” he continues. The first jacket was fast tracked for delivered to Adelaide from the UK and fitted within two weeks of the original measurements being taken. Virtually spot on! A few adjustments in the form of millimetre changes to the lid corner post slot, and the rest of the order was made and delivered in the remaining time period. Feature Articles
|