Premium StorefrontHave a Storefront like this
Provided by Earthco Projects
Property Developer’s and Road Contractor’s Benefit from PolyCom Stabilising Aid
Civil roadworks contractor’s and Subdivision specialists can benefit from reduced water use and the ability to improve sub standard soils to make sub-grade improvements with PolyCom treated water during the initial construction Phase of projects.
PolyCom enables use of most materials usually cut to spoil by improving workability of difficult to handle materials.
Less mess from mud dragging out and improved traction as well as reduced dust
Water savings during construction as high as 30 % can be achieved whilst enhancing wet weather performance of roads, whether temporary or permanent.
Reductions in thickness of pavement design are also possible due to CBR increase.
Environmental credentials of PolyCom are impeccable, OHS compliant and easy to use with existing equipment no special machinery required.
Contact Earthco Projects about this item using the form below.
Earthco Projects