Barchip is packaged in a water soluble paper bag.

Dosing & Handling Barchip

Adding Barchip “Bag and All” Before Loading Concrete

Batching Procedure

  1. Determine the correct number of Barchip bags per batch.
  2. Add Barchip bags to the empty agitator.
  3. Add initial batch water.
  4. Mix for one minute before adding dry materials.
  5. Add dry materials and mix for five minutes.

Barchip is specified at a dose rate in kilograms per cubic metre according to project requirements.

Prior to batching determine the correct number of Barchip bags per batch. Check dose rate per cubic metre, number of cubic metres in the batch and the correct number of bags for the kilograms required.

Barchip is packaged in a water soluble paper bag.

It is recommended that Barchip (bag and all) is added from an approved loading platform to the empty concrete agitator before water and dry materials.

The bags should then be mixed with initial batch water for at least one minute to dissolve the bag and release the fibres.

After completing the batching process, mix for five minutes until all ingredients are blended into a homogenous mixture.