Trusted by 500,000+ buyers, sourcing equipment from 1000's of industrial brands

Hisami Tunnel Project

Supplier: Elastoplastic Concrete
19 October, 2009

Use Secondary Lining

Hisami Tunnel Project:

  • Date: March - May 2004
  • Use: Secondary Lining
  • Dose: 3 kg / m3 (0.3%)
  • Fibre: Barchip 4350 48 mm
  • Volume: 1,244 m3
  • Location: Okayama Prefecture
  • Contractor: PS Mitsubishi, Koji JV
  • Client: Japan Highway Board

To Know about Hisami Tunnel Project: Please click here