Trusted by 500,000+ buyers, sourcing equipment from 1000's of industrial brands
50 views or less

Tank Manway Lids

Supplier: Fibretank Systems Pty Ltd

When installing a tank is important to ensure that all the bolts on tank manway lid/s are tightened once the tank is in the ground.

Price Guide: POA

Tank Manway Lids

We have recently become aware of tanks that have failed testing due to leaking through the manway lid.

The recommended sequence is to start at 6 o’clock then go to 12 o’clock and then continue the same sequence clockwise.

It is also important not to overtighten the bolts, they should not exceed 169 newton metres.