Home Trusted by 500,000+ buyers

Workstation Crane cuts down operating time

Supplier: Safetech

A Free Standing Gorbel Work Station Crane with 3 Bridges; 2 G-Forces® and a hoist: • Bridge 1: has a 70kg G-Force® with float mode and is used to install smaller components • Bridge 2: has a 170kg G-Force® with float mode and is used to install larger, heavier cooling packages to the engines • Bridge 3: has a hoist and is used for joining the transmissions together (where applicable)

Price Guide (Inc GST): POA

The G-Force® system has drastically cut down time on the assembly of the engine. Previously, this process would take operators a total of an hour to install the cooling package; but now only takes them five minutes.

The ease of operation and the decrease risk of causing injury has created less stress for the employer and employees.