Smarter maintenance, stronger performance: the first year of Aspen Mtell® at Ok Tedi

Ok Tedi partnered with Mipac to deploy Aspen Mtell®, using predictive analytics to boost asset reliability and reduce downtime across critical circuits in its Papua New Guinea operations.

Background

In 2023, Ok Tedi Mining Limited (OTML) selected Aspen Mtell® as the preferred solution to strengthen asset reliability across its copper and gold operations in Papua New Guinea. Mipac was engaged to lead the implementation, following a detailed evaluation of available systems and a long-standing relationship with OTML through major automation and improvement projects.

The initial deployment focused on Mtell’s predictive analytics capabilities — using machine learning to detect early signs of degradation leading to equipment failure and provide timely, actionable insights for maintenance teams.

Scope of the initial rollout

The first phase of implementation began in May 2024 and focused on ten critical assets in the crushing and grinding circuit. These assets were selected for their impact on production and history of unplanned maintenance.

The delivery was split into two parts:

  • AspenTech, supported by Mipac, implemented the first five assets
  • Mipac led the deployment of the remaining five

The project included:

  • Installation of Mtell® software
  • Integration with sensor time-series and maintenance data provided by OTML
  • Development and tuning of Mtell’s intelligent agents for each asset
  • Ongoing support and review of system alerts in collaboration with site personnel

 

Results after 12 months

After one year of operation, Mtell® has delivered significant benefits to Ok Tedi’s maintenance and operations teams and OTML is looking to renew for another three years. These benefits include:

·       Earlier identification of issues: The system successfully identified signs of equipment degradation ahead of failure, allowing maintenance teams to intervene before downtime occurred.

·       Improved reliability of high-impact assets: Several incidents were avoided through early alerts, reducing the risk of production losses in critical circuits.

·       Reduced unplanned maintenance: With better visibility into equipment condition, site teams were able to plan interventions more effectively and avoid reactive repairs.

·       Enhanced decision-making: The system’s insights supported more focused discussions between operations and maintenance teams, helping to prioritise work and allocate resources more efficiently.

Mipac worked closely with site personnel to review alerts, refine system performance, and embed the use of Mtell® into day-to-day workflows.

Mtell® Asset Rollout

In June 2025, OTML issued a new purchase order for the rollout of Mtell® across an additional 38 assets, expanding the system into the flotation plant and power generation areas. This broader deployment reflects OTML’s confidence in Mtell’s performance and the value it delivers to site.

Mipac’s new scope includes:

1. Project Initiation

  • Kick-off meeting to align teams, schedule, and expectations
  • Workshop to identify gaps in instrumentation or data availability

2. Design Phase

  • Review of OTML’s historical work orders, sensor data, and Enterprise Asset Management (EAM) hierarchy
  • Data quality validation and mapping sensor tags to relevant assets
  • Importing alarm limits and failure history into Aspen Mtell®
  • Grouping similar equipment for streamlined monitoring (e.g. pump trains)
  • Use of P&IDs and process flow diagrams to define logical groupings
  • Identification of ON/OFF conditions and asset operating states

3. Build Phase

  • Configuring templates and agent types:
    • Hidden failure agents
    • Anomaly detection agents
    • Rule-based and failure library agents
  • Iterative testing and validation with OTML subject matter experts

4. Deploy & Go Live

  • Real-time deployment of agents to monitor live data streams
  • Agents continuously learning and retraining to alert operators to emerging failure patterns
  • Final project close-out with issue tracking and system support

Mipac will continue to provide support and optimisation services for the next 12 months to ensure the system remains accurate, relevant and embedded in operational practices.

Outcomes

While project outcomes will continue to develop over time, the Mtell® deployment has positioned OTML to:

  • Detect asset degradation well before failure beyond the capabilities of existing OTML systems
  • Automate insights into abnormal operating behaviour
  • Improve condition-based maintenance scheduling
  • Build a digital foundation for scaling predictive maintenance across the site

Mipac's role

Mipac acted as the integration and deployment partner, bridging the gap between OTML’s data sources and Aspen Mtell’s machine learning models. This included deep data preparation, stakeholder workshops and hands-on engineering expertise to ensure a robust and effective outcome tailored to the site’s operational context and history.

 In summary

The first year of Mtell® implementation at Ok Tedi has demonstrated the potential of predictive analytics to improve equipment reliability, reduce unplanned downtime and support more proactive maintenance strategies.

 For OTML, the expansion of Mtell® represents a shift toward long-term, data-driven asset management. For Mipac, it reinforces the importance of combining the right technology with deep site knowledge and ongoing support to deliver sustainable outcomes.

Get 3+ quotes so you can compare and choose the supplier that's right for you