Trusted by 500,000+ buyers, sourcing equipment from 1000's of industrial brands
50 views or less

Universal High Load Truss Boot

Supplier: Multinail Australia

Steel girder brackets for connecting girder trusses to the bottom chord of primary girder trusses.

Price Guide: POA

Universal High Load Truss Boot

Application

  • Place the High Load Truss Boot in the correct position and rill holes in the bottom chord of the girder truss to suit M16 bolts.
  • Align the bolt holes of the High Load Truss boot to the holes in the girder truss and install the M16 boltswith the correct size washers.
  • Place the supported truss on the bracket and drill holes into the supported truss to suit M12 bolts.
  • Align the bolt holes of the High Load Truss Boot to the bolt holes in the supported truss and install the M12 bolts with the correct size washers.
  • Tighten all botls before loading with roof materials

Showcase your business!

Connect with 600,000 industrial buyers annually

Learn more