Fume Cupboard Servicing
Fume Cupboard Servicing
Walton Plastics Engineering offer 6 monthly and 12 monthly service and maintenance testing of fume cupboards in accordance with AS/NZS 2243.8: 2006 Safety in Laboratories Part 8. Fume Cupboards.
Fume Cupboard Service & Maintenance
Walton Plastics Engineering offer 6 monthly and 12 monthly Service and Maintenance testing of fume cupboards in accordance with AS/NZS 2243.8: 2006 Safety in Laboratories Part 8. Fume Cupboards.
All services and maintenance works are carried out by our fully trained service technicians, with the backup of our experiences engineers.
Reports are issued on completion of servicing and testing. Minor maintenance can be carried out during the service, and any additional maintenance requirement not able to be completed as part of the service will be listed in the report issued on completion.
Walton Plastics Engineering's service technicians carry a small array of parts which if required for repairs can be completed during the service with only the part being an additional charge. Repairs requiring parts will only be completed on approval.
Six monthly maintenance and testing includes:
- Face velocity test
- Smoke test.
- Inspection of fans, motors, drives, and bearings.
Bearings lubricated if required
Belts changed if required
- Check scrubbers and wash down facilities for correct operation.
- Check air cleaning device if fitted.
- Check condition of thermal heads and duct sprays if fitted.
- Remove baffles and clean back of fume cupboard chamber and baffles.
Twelve monthly maintenance and testing includes:
- All checks as for 6 monthly.
- Wash entire internal surface of fume cupboard cabinet and repair defects.
- Check condition of services to fume cupboard and ensure they are properly identified and operational.
- Check stability and condition of discharge stack.
- Check condition of exhaust ducting where possible. Check that joints are intact and drains where fitted are clear.
- Check condition of satisfactory operation of fume cupboard control system.
- Check operation of emergency isolator.
- Check operation of automatic isolator.
- Check system for conformance to AS2243.8.
- Attach label to fume cupboard showing inspection date, name of inspector and report number, overall test result and date of next inspection.
To contact Walton Plastics Engineering about Fume Cupboard Servicing use Get a quote.
Fume Cupboard Service & Maintenance
Walton Plastics Engineering offer 6 monthly and 12 monthly Service and Maintenance testing of fume cupboards in accordance with AS/NZS 2243.8: 2006 Safety in Laboratories Part 8. Fume Cupboards.
All services and maintenance works are carried out by our fully trained service technicians, with the backup of our experiences engineers.
Reports are issued on completion of servicing and testing. Minor maintenance can be carried out during the service, and any additional maintenance requirement not able to be completed as part of the service will be listed in the report issued on completion.
Walton Plastics Engineering's service technicians carry a small array of parts which if required for repairs can be completed during the service with only the part being an additional charge. Repairs requiring parts will only be completed on approval.
Six monthly maintenance and testing includes:
- Face velocity test
- Smoke test.
- Inspection of fans, motors, drives, and bearings.
Bearings lubricated if required
Belts changed if required
- Check scrubbers and wash down facilities for correct operation.
- Check air cleaning device if fitted.
- Check condition of thermal heads and duct sprays if fitted.
- Remove baffles and clean back of fume cupboard chamber and baffles.
Twelve monthly maintenance and testing includes:
- All checks as for 6 monthly.
- Wash entire internal surface of fume cupboard cabinet and repair defects.
- Check condition of services to fume cupboard and ensure they are properly identified and operational.
- Check stability and condition of discharge stack.
- Check condition of exhaust ducting where possible. Check that joints are intact and drains where fitted are clear.
- Check condition of satisfactory operation of fume cupboard control system.
- Check operation of emergency isolator.
- Check operation of automatic isolator.
- Check system for conformance to AS2243.8.
- Attach label to fume cupboard showing inspection date, name of inspector and report number, overall test result and date of next inspection.
To contact Walton Plastics Engineering about Fume Cupboard Servicing use Get a quote.
Walton Plastics Engineering tests and maintains fume cupboards in line with AS/NZS 2243.8:2006. On completion, Walton issues a report identifying maintenance requirements the technicians could not complete during the service, giving the buyer a written record of work still needing attention. For a quote, provide the number of cupboards, site location and preferred service interval.
- Six-monthly servicing includes face-velocity and smoke tests
- Fans, motors, drives and bearings inspected; bearings lubricated and belts changed if required
- Scrubbers and wash-down facilities checked; fitted air-cleaning device checked
- Twelve-monthly service cleans cabinet interior; checks ducting where possible, controls and isolators
- Parts for repairs incur an extra charge; repairs requiring parts need approval
Source: listing by Walton Plastics Engineering on IndustrySearch · Updated 30 Oct 2026
AI Overview is generated by artificial intelligence and may contain mistakes.
Written by AI from the listing by Walton Plastics Engineering on IndustrySearch. It is meant to use only what that listing says, but it can still get details wrong, so check them with the supplier before you buy.
Thanks for your feedback.
- Your delivery location?
- NSW
- VIC
- QLD
- SA
- WA
- NT
- ACT
- TAS
- New Zealand
- Papua New Guinea
- Afghanistan
- Albania
- Algeria
- Andorra
- Angola
- Antigua and Barbuda
- Argentina
- Armenia
- Austria
- Azerbaijan
- Bahamas
- Bahrain
- Bangladesh
- Barbados
- Belarus
- Belgium
- Belize
- Benin
- Bhutan
- Bolivia
- Bosnia and Herzegovina
- Botswana
- Brazil
- Brunei
- Bulgaria
- Burkina Faso
- Burma
- Burundi
- Cabo Verde
- Cambodia
- Cameroon
- Canada
- Central African Republic
- Chad
- Chile
- China
- Colombia
- Comoros
- Congo (Brazzaville)
- Congo (Kinshasa)
- Costa Rica
- Côte d'Ivoire
- Croatia
- Cuba
- Cyprus
- Czechia
- Denmark
- Djibouti
- Dominica
- Dominican Republic
- Ecuador
- Egypt
- El Salvador
- Equatorial Guinea
- Eritrea
- Estonia
- Ethiopia
- Fiji
- Finland
- France
- Gabon
- Gambia
- Georgia
- Germany
- Ghana
- Greece
- Grenada
- Guatemala
- Guinea
- Guinea-Bissau
- Guyana
- Haiti
- Holy See
- Honduras
- Hungary
- Iceland
- India
- Indonesia
- Iran
- Iraq
- Ireland
- Israel
- Italy
- Jamaica
- Japan
- Jordan
- Kazakhstan
- Kenya
- Kiribati
- Korea, North
- Korea, South
- Kosovo
- Kuwait
- Kyrgyzstan
- Laos
- Latvia
- Lebanon
- Lesotho
- Liberia
- Libya
- Liechtenstein
- Lithuania
- Luxembourg
- Macedonia
- Madagascar
- Malawi
- Malaysia
- Maldives
- Mali
- Malta
- Marshall Islands
- Mauritania
- Mauritius
- Mexico
- Federated States of Micronesia
- Moldova
- Monaco
- Mongolia
- Montenegro
- Morocco
- Mozambique
- Namibia
- Nauru
- Nepal
- Netherlands
- New Zealand
- Nicaragua
- Niger
- Nigeria
- Norway
- Oman
- Pakistan
- Palau
- Panama
- Papua New Guinea
- Paraguay
- Peru
- Philippines
- Poland
- Portugal
- Qatar
- Romania
- Russia
- Rwanda
- Saint Kitts and Nevis
- Saint Lucia
- Saint Vincent and the Grenadines
- Samoa
- San Marino
- Sao Tome and Principe
- Saudi Arabia
- Senegal
- Serbia
- Seychelles
- Sierra Leone
- Singapore
- Slovakia
- Slovenia
- Solomon Islands
- Somalia
- South Africa
- South Sudan
- Spain
- Sri Lanka
- Sudan
- Suriname
- Swaziland
- Sweden
- Switzerland
- Syria
- Taiwan
- Tajikistan
- Tanzania
- Thailand
- Timor-Leste
- Togo
- Tonga
- Trinidad and Tobago
- Tunisia
- Turkey
- Turkmenistan
- Tuvalu
- Uganda
- Ukraine
- United Arab Emirates
- United Kingdom
- United States
- Uruguay
- Uzbekistan
- Vanuatu
- Venezuela
- Vietnam
- Yemen
- Zambia
- Zimbabwe
- NSW
- VIC
- QLD
- SA
- WA
- NT
- ACT
- TAS
- New Zealand
- Papua New Guinea
- Afghanistan
- Albania
- Algeria
- Andorra
- Angola
- Antigua and Barbuda
- Argentina
- Armenia
- Austria
- Azerbaijan
- Bahamas
- Bahrain
- Bangladesh
- Barbados
- Belarus
- Belgium
- Belize
- Benin
- Bhutan
- Bolivia
- Bosnia and Herzegovina
- Botswana
- Brazil
- Brunei
- Bulgaria
- Burkina Faso
- Burma
- Burundi
- Cabo Verde
- Cambodia
- Cameroon
- Canada
- Central African Republic
- Chad
- Chile
- China
- Colombia
- Comoros
- Congo (Brazzaville)
- Congo (Kinshasa)
- Costa Rica
- Côte d'Ivoire
- Croatia
- Cuba
- Cyprus
- Czechia
- Denmark
- Djibouti
- Dominica
- Dominican Republic
- Ecuador
- Egypt
- El Salvador
- Equatorial Guinea
- Eritrea
- Estonia
- Ethiopia
- Fiji
- Finland
- France
- Gabon
- Gambia
- Georgia
- Germany
- Ghana
- Greece
- Grenada
- Guatemala
- Guinea
- Guinea-Bissau
- Guyana
- Haiti
- Holy See
- Honduras
- Hungary
- Iceland
- India
- Indonesia
- Iran
- Iraq
- Ireland
- Israel
- Italy
- Jamaica
- Japan
- Jordan
- Kazakhstan
- Kenya
- Kiribati
- Korea, North
- Korea, South
- Kosovo
- Kuwait
- Kyrgyzstan
- Laos
- Latvia
- Lebanon
- Lesotho
- Liberia
- Libya
- Liechtenstein
- Lithuania
- Luxembourg
- Macedonia
- Madagascar
- Malawi
- Malaysia
- Maldives
- Mali
- Malta
- Marshall Islands
- Mauritania
- Mauritius
- Mexico
- Federated States of Micronesia
- Moldova
- Monaco
- Mongolia
- Montenegro
- Morocco
- Mozambique
- Namibia
- Nauru
- Nepal
- Netherlands
- New Zealand
- Nicaragua
- Niger
- Nigeria
- Norway
- Oman
- Pakistan
- Palau
- Panama
- Papua New Guinea
- Paraguay
- Peru
- Philippines
- Poland
- Portugal
- Qatar
- Romania
- Russia
- Rwanda
- Saint Kitts and Nevis
- Saint Lucia
- Saint Vincent and the Grenadines
- Samoa
- San Marino
- Sao Tome and Principe
- Saudi Arabia
- Senegal
- Serbia
- Seychelles
- Sierra Leone
- Singapore
- Slovakia
- Slovenia
- Solomon Islands
- Somalia
- South Africa
- South Sudan
- Spain
- Sri Lanka
- Sudan
- Suriname
- Swaziland
- Sweden
- Switzerland
- Syria
- Taiwan
- Tajikistan
- Tanzania
- Thailand
- Timor-Leste
- Togo
- Tonga
- Trinidad and Tobago
- Tunisia
- Turkey
- Turkmenistan
- Tuvalu
- Uganda
- Ukraine
- United Arab Emirates
- United Kingdom
- United States
- Uruguay
- Uzbekistan
- Vanuatu
- Venezuela
- Vietnam
- Yemen
- Zambia
- Zimbabwe
Controller | ECO-SENSE
Chemical Resistant Fans | CMVeco 125 - 400
Custom PVC Duct Work | Walton Plastics Engineering
PVC Bed Pan Racks | Walton Plastics Engineering
PVC Bottle Rack | Walton Plastics Engineering
Fume Cupboard Servicing
Underbench PVC Plaster Traps | Walton Plastics Engineering
Fume Cupboards | Labaire
Metal Frame Benches | Walton Plastics Engineering
Laboratory Sinks & Benches | Walton Plastics Engineering
Double Sided Fume Cupboards | Labaire
Recirculating Mobile Fume Cupboards | Walton Plastics Engineering
Chemical Resistant Fans | Colasit
Recirculating Mobile Fume Cupboards | Walton Plastics Engineering
Double Sided Fume Cupboards | Labaire
Fume Cupboards | Labaire
Energy Efficient Fume Cupboards and Controllers | EcoSash
Fume Cupboards
Ecoair® (VAV) Fume Cupboards
Laminair® Fume Cabinet & Cupboard
RX Series Fume Cupboard - Ducted
Fume Cupboard - Ductless | SafeGuard™
Ductless Fume Cupboards | Esco
Laminar Flow Cupboard | SafeGuard HLF
Thanks for your help!
Sorry! Unable to submit your request at this time. Please try again later.
Report this product
